| 40 |
Implementation of Lithium Technologies in Mitigation and Prevention of Alkali-Silica Reaction in Concrete
|
Solicitation withdrawn |
Federal Highway Administration |
Aug 8, 2003 |
| 822 |
Life Cycle Curves for Sign Management
|
Solicitation withdrawn |
South Dakota Department of Transportation |
Jan 31, 2005 |
| 916 |
Geophysical Testing of Rock and Its Relationships to Physical Properties
|
Solicitation withdrawn |
Florida Department of Transportation |
Jan 3, 2006 |
| 924 |
One Coat Paint System for a Lifetime of Corrosion Protection on New Steel Bridges
|
Solicitation withdrawn |
Federal Highway Administration |
Oct 1, 2008 |
| SPR-2(166) |
Performance Evaluation of Crumb Rubber Modifier (CRM) in Asphalt Pavements
|
Closed |
Federal Highway Administration |
May 21, 2012 |
| SPR-2(167) |
Development of Anti-Icing Treatments
|
Closed |
Federal Highway Administration |
Apr 9, 2013 |
| SPR-2(200) |
Compilation and Evaluation of Results from High-Performance Concrete Bridge Projects
|
Closed |
Federal Highway Administration |
Mar 10, 2009 |
| SPR-2(204) |
Study Highway Innovation Technology Evaluation Center
|
Closed |
Federal Highway Administration |
Apr 9, 2013 |
| SPR-2(206) |
Geocomposite Capillary Barrier Drain for Limiting Moisture Changes in Pavement Subgrades and Base Courses
|
Closed |
Federal Highway Administration |
Aug 5, 2009 |
| SPR-2(208) |
Pavement Subgrade Performance Study
|
Contract signed |
Federal Highway Administration |
Oct 2, 2012 |
| SPR-2(209) |
Enhanced Guidance for Implementation of Safety Strategies
|
Objectives fulfilled |
Federal Highway Administration |
Dec 3, 2009 |
| SPR-2(212) |
Non-nuclear Testing of Soils and Granular Bases Using the GeoGauge
|
Closed |
Federal Highway Administration |
Apr 9, 2013 |
| SPR-2(800) |
SHRP Implementation Asphalt Test Equipment
|
Objectives fulfilled |
Federal Highway Administration |
Dec 11, 2009 |
| SPR-3(009) |
New England Surface Transportation Consortium
|
Closed |
Federal Highway Administration |
Apr 7, 2010 |
| SPR-3(029) |
New England Transportation Consortium
|
Closed |
Connecticut Department of Transportation |
Sep 16, 2010 |
| SPR-3(041) |
New England Transportation Technical Certification Program
|
Closed |
Federal Highway Administration |
Jun 9, 2011 |
| SPR-3(043) |
Development of a Self-Restoring Impact Attenuator
|
Closed |
California Department of Transportation |
Sep 7, 2011 |
| SPR-3(050) |
New England Traffic Monitoring System
|
Closed |
Vermont Agency of Transportation |
Sep 16, 2010 |
| SPR-3(052) |
Procedures for the Evaluation of Sheet Membrane Waterproofing
|
Closed |
Vermont Agency of Transportation |
Oct 2, 2008 |
| SPR-3(056) |
Superpave Implementation Support-The NE Superpave Center
|
Closed |
Pennsylvania Department of Transportation |
Oct 12, 2010 |
| SPR-3(073) |
Micro-Surface Mix Design Procedure
|
Closed |
California Department of Transportation |
Dec 21, 2011 |
| SPR-3(076) |
Animal Vehicle Crash Mitigation Using Advanced Technologies
|
Closed |
Oregon Department of Transportation |
Nov 26, 2010 |
| SPR-3(077) |
Wiremesh and Cablemesh Slope Protection
|
Closed |
Washington State Department of Transportation |
Nov 23, 2010 |
| SPR-3(080) |
Reinstatement of Utility Cuts
|
Closed |
Federal Highway Administration |
Dec 10, 2012 |
| SPR-3(083) |
FIXS-Fabrication error Indexed examples and Solutions
|
Closed |
Kansas Department of Transportation |
Aug 5, 2009 |
| SPR-3(089) |
New England Transportation Consortium
|
Contract signed |
Connecticut Department of Transportation |
Dec 7, 2012 |
| TPF-5(003) |
Extending the Season for Concrete Construction and Repair
|
Closed |
Federal Highway Administration |
Oct 18, 2010 |
| TPF-5(005) |
Study of Erection Issues and Composite System Behavior of the Full-Scale Curved Girder Bridge Currently Under Construction at the Turner-Fairbank Highway Research Center
|
Closed |
Federal Highway Administration |
May 15, 2013 |
| TPF-5(024) |
Next Generation Retro-Reflective Beads for Traffic Paints
|
Closed |
New Hampshire Department of Transportation |
Aug 3, 2009 |
| TPF-5(028) |
Product Evaluation--Highway Innovative Technology Evaluation Center
|
Closed |
Federal Highway Administration |
Apr 9, 2013 |
| TPF-5(045) |
Performance Guidelines for the Selection of Hot-Pour Crack Sealants
|
Closed |
Virginia Department of Transportation |
Oct 12, 2010 |
| TPF-5(051) |
Construction of Crack-Free Concrete Bridge Decks
|
Closed |
Kansas Department of Transportation |
Sep 12, 2011 |
| TPF-5(054) |
Development of Maintenance Decision Support System
|
Contract signed |
South Dakota Department of Transportation |
Feb 23, 2013 |
| TPF-5(059) |
State-of-the-Art Bridge Surveillance and Security Technologies
|
Closed |
Federal Highway Administration |
Apr 8, 2013 |
| TPF-5(062) |
Coordination of Pavement Activities in the Northeast, Phase 2 (Adding new partners & pledges)
|
Closed |
Connecticut Department of Transportation |
Nov 23, 2010 |
| TPF-5(065) |
Traffic Control Device (TCD) Consortium
|
Cleared by FHWA |
Federal Highway Administration |
May 1, 2012 |
| TPF-5(068) |
Long-Term Maintenance of Load and Resistance Factor Design Specifications
|
Closed |
Iowa Department of Transportation |
Nov 10, 2011 |
| TPF-5(075) |
Extending the Season for Concrete Construction and Repair--Phase II, Defining Engineering Parameters
|
Closed |
Federal Highway Administration |
Dec 17, 2010 |
| TPF-5(086) |
Reducing Crashes at Rural Intersections: Toward a Multi-State Consensus on Rural Intersection Decision Support
|
Closed |
Minnesota Department of Transportation |
Dec 17, 2010 |
| TPF-5(096) |
Validation of NDT Results for Condition Assessment of Rock Reinforcements
|
Closed |
New Hampshire Department of Transportation |
Jun 12, 2009 |