TPF Studies>>>Detailed View |
| Study Number: | SPR-3(073) |
| Status: | Cleared by FHWA |
| Title: | Micro-Surface Mix Design Procedure |
| Contract/Other Number: | |
| Sponsoring Agency: | California Department of Transportation |
| Lead Agency: | California Department of Transportation |
| Lead Agency Contact: | Joe Holland (t.joe.holland@dot.ca.gov) Phone: 916-227-5825 Fax: 916-324-2669
|
| FHWA Technical Liaison: | James Sorenson (James.Sorenson@fhwa.dot.gov) |
| Study Partners: | CA, DE, GA, IL, KS, ME, MI, MN, MO, ND, NE, NH, NY, TX, VT |
| Contract Amount: | $0 |
| Commitments Received: | $117,500 |
| 100% SP&R Approval: | Approved |
| Objectives: | Recent reports from the FHWA and Texas A&M University highlight the apparent problems with using existing methods for Micro-Surfacing and suggest that comprehensive mix design and analysis procedures need to be developed. It is believed that a Micro-Surfacing Mix design procedure is essential to elevate this surface treatment method to the highest level of acceptance. The procedure should establish the level of components in the mixture and the tests run must predict performance. The mix design procedure should address several specific aspects of micro-surfacing. |
| Comments: | The contract was awarded to Frugro-BRE of Austin, Texas on July 1, 2003. A literature search has begun and includes both national and international references. Also, a survey of micro-surfacing and slurry seal uses and experiences has been sent out to the States and industry. Information gathered in this phase of the study will be used to identify performance parameters that are essential for success. |
| Active Study URL: | http://www.dot.ca.gov/research/maintenance/slurry_micro-surface/slurry_micro-surface.htm |
| Study Documents: | Slurry/Micro-Surfacing Mix Procedure - Jan - Mar 08 |
| | Type: Quarterly Progress Report |
| | Slurry/Micro-Surfacing Mix Procedure - Apr - Jun 2007 |
| | Type: Quarterly Progress Report |
| | Slurry/Micro-Surfacing Mix Procedure - Jan - Mar 07 |
| | Type: Quarterly Progress Report |
| | Slurry/Micro-Surfacing Mix Procedure - Jul - Dec 2006 |
| | Type: Quarterly Progress Report |
| | Slurry/Micro-Surfacing Mix Procedure - Apr - Jun 2006 |
| | Type: Quarterly Progress Report |
| | Slurry/Micro-Surfacing Mix Procedure - Jan - Mar 2006 |
| | Type: Quarterly Progress Report |
| | Slurry/Micro-Surfacing Mix Procedure - Oct - Dec 2005 |
| | Type: Quarterly Progress Report |
| | Slurry/Micro-Surfacing Mix Procedure - Jul - Sep 2005 |
| | Type: Quarterly Progress Report |
| | Slurry/Micro-Surfacing Mix Procedure - Apr - June 2005 |
| | Type: Quarterly Progress Report |
| | Slurry/Micro-Surfacing Mix Procedure - Jul - Sep 2004 |
| | Type: Quarterly Progress Report |
| Subjects: | Maintenance |
|   | Materials and Construction |
|   | Pavement Design, Management, and Performance |
| .................... .................... .................... .................... .................... .................... .................... .................... |