TPF Studies>>>Detailed View |
| Study Number: | TPF-5(045) |
| Status: | Cleared by FHWA |
| Title: | Performance Guidelines for the Selection of Hot-Pour Crack Sealants |
| Contract/Other Number: | |
| Sponsoring Agency: | Virginia Department of Transportation |
| Lead Agency: | Virginia Department of Transportation |
| Lead Agency Contact: | Kevin McGhee (Kevin.McGhee@VirginiaDOT.org) Phone: 434-293-1956 Fax: 434-293-1990
|
| FHWA Technical Liaison: | Steve Mueller (steve.mueller@dot.gov) FHWA Routing Symbol: RC-LKWD |
| Contractor: | Virginia Tech |
| Investigator: | Imad Al-Qadi |
| Study Partners: | CT, DC, GA, ME, MI, MN, NH, NJ, NY, RI, TX, VA |
| Contract Amount: | $760,000 |
| Commitments Received: | $767,500 |
| 100% SP&R Approval: | Approved |
| Contract Start Date: | 3/1/2003 |
| Contract End Date: | 3/31/2008 |
| Objectives: | This project will result in extended pavement surface life and thus reduced roadway rehabilitation and maintenance costs. Guidelines for sealant selection are being proposed because the durability of crack sealants used on the North American roadways is often shorter than expected, even though crack sealing is the most common method of preventative maintenance. |
| Comments: | A technical panel has considered sealant homogeneity/segregation and deemed it a construction (not materials) issue and therefore beyond the scope of the current study. A proposed accelerated sealant aging method is being considered for further development and will likely be validated through a comparison of sealants aged in the laboratory against six sealants weathered in the field for up to 9 years. Finally, bending beam rheometry, direct tensile testing, and creep-recovery are being evaluated (for low temperature testing) to determine if any of these methods are sufficiently developed for inclusion in the performance-based specification. (11/17/03).
|
| Study Documents: | Development of Performance Based Guidelines for Selection of Bituminous-Based Hot Poured Pavement Crack Sealant: An Executive Summary Report |
| | Type: Final Report |
| | Quarterly Report: 9/1/2007 - 11/30/2007 |
| | Type: Quarterly Progress Report |
| | Quarterly Report: 6/1/2007 - 8/31/2007 |
| | Type: Quarterly Progress Report |
| | Quarterly Report: 3/1/2007 - 5/31/2007 |
| | Type: Quarterly Progress Report |
| | Quarterly Report: 12/1/2006 - 02/28/2007 |
| | Type: Quarterly Progress Report |
| | Quarterly Report: 9/1/2006 - 11/30/2006 |
| | Type: Quarterly Progress Report |
| | Quarterly Report: 6/1/2006 - 8/31/2006 |
| | Type: Quarterly Progress Report |
| | Second Quarter Report 2006 |
| | Type: Quarterly Progress Report |
| | First Quarter Report 2006 |
| | Type: Quarterly Progress Report |
| | Fourth Quarter Report 2005 |
| | Type: Quarterly Progress Report |
| | Third Quarter Report 2005 |
| | Type: Quarterly Progress Report |
| | Second Quarter Report 2005 |
| | Type: Quarterly Progress Report |
| | First Quarter Report 2005 |
| | Type: Quarterly Progress Report |
| | Fourth Quarter Report 2004 |
| | Type: Quarterly Progress Report |
| | Contract/Grant Progress Report (November 1, 2003) |
| | Type: Report |
| | Contract/Grant Progress Report (June 1, 2003) |
| | Type: Report |
| Subjects: | Maintenance |
|   | Pavement Design, Management, and Performance |
| .................... .................... .................... .................... .................... .................... .................... .................... |