Base Funding for the North Central Superpave Center

Print
General Information
Study Number: TPF-5(021)
Former Study Number:
Lead Organization: Indiana Department of Transportation
Contract Start Date: Jul 01, 2002
Solicitation Number: 790
Partners: IADOT, IL, IN, KS, MI, MO, WI
Contractor(s): Purdue University
Status: Closed
Est. Completion Date: Jun 30, 2016
Contract/Other Number: TPF-5(021)
Last Updated: Dec 08, 2017
Contract End Date: Jun 30, 2016
Financial Summary
Contract Amount: $125,000.00
Suggested Contribution:
Total Commitments Received: $1,300,000.00
100% SP&R Approval: Approved
Contact Information
Lead Study Contact(s): Tommy Nantung
tnantung@indot.in.gov
Phone: 765-463-1521 ext 248
FHWA Technical Liaison(s): Michael Adams
mike.adams@dot.gov
Phone: 202-493-3025
Organization Year Commitments Technical Contact Name Funding Contact Name
Illinois Department of Transportation 2004 $25,000.00 James Trepanier Megan Swanson
Illinois Department of Transportation 2005 $25,000.00 James Trepanier Megan Swanson
Illinois Department of Transportation 2006 $25,000.00 James Trepanier Megan Swanson
Illinois Department of Transportation 2007 $25,000.00 James Trepanier Megan Swanson
Illinois Department of Transportation 2008 $25,000.00 James Trepanier Megan Swanson
Illinois Department of Transportation 2009 $25,000.00 James Trepanier Megan Swanson
Illinois Department of Transportation 2010 $15,000.00 James Trepanier Megan Swanson
Illinois Department of Transportation 2011 $15,000.00 James Trepanier Megan Swanson
Illinois Department of Transportation 2012 $15,000.00 James Trepanier Megan Swanson
Illinois Department of Transportation 2013 $15,000.00 James Trepanier Megan Swanson
Illinois Department of Transportation 2014 $15,000.00 James Trepanier Megan Swanson
Indiana Department of Transportation 2004 $25,000.00 Tommy Nantung Tommy Nantung
Indiana Department of Transportation 2005 $25,000.00 Tommy Nantung Tommy Nantung
Indiana Department of Transportation 2006 $25,000.00 Tommy Nantung Tommy Nantung
Indiana Department of Transportation 2007 $25,000.00 Tommy Nantung Tommy Nantung
Indiana Department of Transportation 2008 $25,000.00 Tommy Nantung Tommy Nantung
Indiana Department of Transportation 2009 $25,000.00 Tommy Nantung Tommy Nantung
Indiana Department of Transportation 2010 $25,000.00 Tommy Nantung Tommy Nantung
Indiana Department of Transportation 2011 $25,000.00 Tommy Nantung Tommy Nantung
Indiana Department of Transportation 2012 $25,000.00 Tommy Nantung Tommy Nantung
Indiana Department of Transportation 2013 $25,000.00 Tommy Nantung Tommy Nantung
Indiana Department of Transportation 2014 $25,000.00 Tommy Nantung Tommy Nantung
Iowa Department of Transportation 2004 $25,000.00 Scott Schram -- --
Iowa Department of Transportation 2005 $25,000.00 Scott Schram -- --
Iowa Department of Transportation 2006 $25,000.00 Scott Schram -- --
Iowa Department of Transportation 2007 $25,000.00 Scott Schram -- --
Iowa Department of Transportation 2008 $25,000.00 Scott Schram -- --
Iowa Department of Transportation 2009 $25,000.00 Scott Schram -- --
Iowa Department of Transportation 2010 $25,000.00 Scott Schram -- --
Kansas Department of Transportation 2004 $25,000.00 Brian Coree David Behzadpour
Kansas Department of Transportation 2005 $25,000.00 Brian Coree David Behzadpour
Kansas Department of Transportation 2006 $25,000.00 Brian Coree David Behzadpour
Kansas Department of Transportation 2007 $25,000.00 Brian Coree David Behzadpour
Kansas Department of Transportation 2008 $25,000.00 Brian Coree David Behzadpour
Kansas Department of Transportation 2009 $25,000.00 Brian Coree David Behzadpour
Kansas Department of Transportation 2010 $25,000.00 Brian Coree David Behzadpour
Kansas Department of Transportation 2011 $25,000.00 Brian Coree David Behzadpour
Kansas Department of Transportation 2014 $25,000.00 Brian Coree David Behzadpour
Michigan Department of Transportation 2008 $50,000.00 John Barak Andre' Clover
Michigan Department of Transportation 2009 $25,000.00 John Barak Andre' Clover
Michigan Department of Transportation 2010 $25,000.00 John Barak Andre' Clover
Michigan Department of Transportation 2011 $25,000.00 John Barak Andre' Clover
Missouri Department of Transportation 2005 $25,000.00 Dan Oesch Bill Stone
Missouri Department of Transportation 2007 $25,000.00 Dan Oesch Bill Stone
Missouri Department of Transportation 2008 $25,000.00 Dan Oesch Bill Stone
Missouri Department of Transportation 2009 $25,000.00 Dan Oesch Bill Stone
Missouri Department of Transportation 2010 $25,000.00 Dan Oesch Bill Stone
Missouri Department of Transportation 2014 $25,000.00 Dan Oesch Bill Stone
Wisconsin Department of Transportation 2011 $25,000.00 Tom Brokaw Lori Richter
Wisconsin Department of Transportation 2012 $25,000.00 Tom Brokaw Lori Richter
Wisconsin Department of Transportation 2013 $25,000.00 Tom Brokaw Lori Richter
Wisconsin Department of Transportation 2014 $25,000.00 Tom Brokaw Lori Richter
Wisconsin Department of Transportation 2015 $25,000.00 Tom Brokaw Lori Richter

Objectives

This project is no longer accepting funding, please use Project TPF-5(320) This pooled fund project will provide for continued operation of the North Central Superpave Center to assist agencies and industry with Superpave implementation and hot mix asphalt issues. The NCSC will provide technical assistance, training, communication, and research and development work to meet the needs of the region.

Comments

The North Central Superpave Center Steering Committee meeting was held at the end of January 2003 in which this study was discussed. Funds and state partners are currently being solicited for participation.

Subjects: Pavement Design, Management, and Performance

Documents Attached
Title File/Link Document Category Document Type Privacy Document Date Download
TPF-5(021) Closeout Letter TPF-5(021) Closeout Letter - Signed.pdf Memorandum Other Public 2017-12-08
TPF-5(021) Closeout Funding Spreadsheet TPF-5(021) Closeout Funding Spreadsheet.pdf Other Other Public 2017-11-27
Quarterly Progress Report: October - December 2015 TPF 5(320) Quarterly Report Oct to Dec 2015.pdf Progress Report Quarterly Progress Report Public 2016-03-28
Quarterly Progress Report: October - December 2014 TPF 5(021) Quarterly Report October to December 2014.pdf Progress Report Quarterly Progress Report Public 2015-01-19
TPF-5(021) Quarterly Progress Report Oct - Dec 2014 TPF 5(021) Quarterly Report October to December 2014.pdf Progress Report Quarterly Progress Report Public 2015-01-07
TPF-5(021) Quarterly Progress Report Jul - Sept 2014 TPF 5(021) Quarterly Report July to September 2014.pdf Progress Report Quarterly Progress Report Public 2015-01-07
Quarterly Progress Report: April - June 2014 TPF 5(021) Quarterly Report April to June 2014.pdf Progress Report Quarterly Progress Report Public 2014-07-11
Quarterly Progress Report: January - March 2014 TPF 5(021) Quarterly Report January to March 2014.pdf Progress Report Quarterly Progress Report Public 2014-03-30
Quarterly Progress Report: October - December 2013 TPF 5(021) Quarterly Report Oct - Dec 2013.pdf Progress Report Quarterly Progress Report Public 2014-01-31
Quarterly Progress Report: July - September 2013 TPF 5(021) Quarterly Report July - September 2013.pdf Progress Report Quarterly Progress Report Public 2013-11-15
Quarterly Progress Report: March - June 2013 TPF 5(021) Quarterly Report March to June 2013.pdf Progress Report Quarterly Progress Report Public 2013-07-10
Quarterly Progress Report: January - March 2013 TPF 5(021) Quarterly Report January to March 2013.pdf Progress Report Quarterly Progress Report Public 2013-05-01
Quarterly Progress Report: October - December 2012 TPF 5(021) Quarterly Report October - December 2012.pdf Progress Report Quarterly Progress Report Public 2013-02-04
TPF-5(021) Quarterly Progress Report Jun - Sept 2012 TPF 5(021) Quarterly Report June to Sept 2012.pdf Progress Report Quarterly Progress Report Public 2012-09-28
TPF-5(021) Quarterly Progress Report Mar - Jun 2012 TPF 5(021) Quarterly Report March - June 2012.pdf Progress Report Quarterly Progress Report Public 2012-09-17
TPF-5(021) Quarterly Progress Report Jan - Mar 2012 TPF 5(021) Quarterly Report January to March 2012.pdf Progress Report Quarterly Progress Report Public 2012-04-27
Acceptance Letter TPF5021 Acceptance Letter.pdf Memorandum Other Public 2008-07-01
Quarterly Progress Report: October - December 2011 TPF 5(021) Quarterly Report October - December 2011.pdf Progress Report Quarterly Progress Report Public 2012-02-02
July - September 2011 TPF 5(021) Quarterly Report - July to Sept 2011.pdf Progress Report Quarterly Progress Report Public 2012-01-12
Progress Report: Jan1 - March 31, 2011 TPF-5(021)QPR-03-2011.pdf Progress Report Quarterly Progress Report Public 2011-05-10
Progress Report: April 1 - June 31, 2011 NCSC Progress Report for April- June 2011.pdf Progress Report Quarterly Progress Report Public 2011-08-02
Progress Report for Jan 1 - March 31, 2010 NCSC_Progress_Report_January-March2010.pdf Progress Report Quarterly Progress Report Public 2010-05-18
Progress Report for July 1 - Sept 30, 2009 qtrly_rpt_2009-09-30.pdf Progress Report Quarterly Progress Report Public 2009-12-21
Progress Report for Oct 1 - Dec 31, 2009 qtrly_rpt_2009-12-31.pdf Progress Report Quarterly Progress Report Public 2010-02-12
Progress Report for July 1 - Sept 30, 2007 qrtrly_rpt_qrt3_07.pdf Progress Report Quarterly Progress Report Public 2007-11-28
Progress Report for Apr 1 - June 30, 2007 qrtrly_rpt_qrt2_07.pdf Progress Report Quarterly Progress Report Public 2007-11-28
Progress Report for Jan 1 - March 31, 2007 qrtrly_rpt_qrt1_07.pdf Progress Report Quarterly Progress Report Public 2007-11-28
Progress Report for Oct 1 - Dec 31, 2006 qrtrly_rpt_qrt4_06.pdf Progress Report Quarterly Progress Report Public 2007-11-28
Progress Report for July 1 - Sept 30, 2006 qrtrly_rpt_qrt3_06.pdf Progress Report Quarterly Progress Report Public 2007-11-28
Progress Report for Oct 1 - Dec 31, 2005 qrtrly_rpt_qrt4_05.pdf Progress Report Quarterly Progress Report Public 2006-04-26
Progress Report for July 1 - Sept 30, 2005 qrtrly_rpt_qrt3_05.pdf Progress Report Quarterly Progress Report Public 2006-04-26
Progress Report for Apr 1 -June 30, 2006 qrtrly_rpt_qrt2_06.pdf Progress Report Quarterly Progress Report Public 2006-09-19
Progress Report for Jan 1 - March 31, 2006 qrtrly_rpt_qrt1_06.pdf Progress Report Quarterly Progress Report Public 2006-07-21
Progress Report for Apr 1 - June 30, 2005 qrtrly_rpt_qrt2_05.pdf Progress Report Quarterly Progress Report Public 2005-10-03
Progress Report for Jan 1 - March 31, 2005 qrtrly_rpt_qrt1_05.pdf Progress Report Quarterly Progress Report Public 2005-10-03
Progress Report for Oct 1 - Dec 31, 2004 qrtrly_rpt_qrt4_04.pdf Progress Report Quarterly Progress Report Public 2005-10-03
Progress Report for July 1 - Sept 30, 2004 qrtrly_rpt_qrt3_04.pdf Progress Report Quarterly Progress Report Public 2005-10-03
Progress Report for Apr 1 - June 30, 2004 qrtrly_rpt_qrt2_04.pdf Progress Report Quarterly Progress Report Public 2005-10-03
Progress Report for Jan 1 - March 31, 2004 qrtrly_rpt_qrt1_04.pdf Progress Report Quarterly Progress Report Public 2005-10-03
Benefits of Participating in the North Central Superpave Center memo_05-30-03.pdf Memorandum Other Public 2003-06-25
Statement of Work - State Planning and Research Pooled Fund Program: Operation of the North Central Superpave Center work_plan_06-23-03.pdf TPF Study Documentation Work Plan/Scope/Charter Public 2003-06-25
Documents Attached
Title File/Link Document Category Document Type Privacy Document Date Download
Base Funding for the North Central Superpave Center work_plan_06-23-03.pdf TPF Study Documentation Solicitation Public 2011-09-25

Base Funding for the North Central Superpave Center

General Information
Study Number: TPF-5(021)
Lead Organization: Indiana Department of Transportation
Contract Start Date: Jul 01, 2002
Solicitation Number: 790
Partners: IADOT, IL, IN, KS, MI, MO, WI
Contractor(s): Purdue University
Status: Closed
Est. Completion Date: Jun 30, 2016
Contract/Other Number: TPF-5(021)
Last Updated: Dec 08, 2017
Contract End Date: Jun 30, 2016
Financial Summary
Contract Amount: $125,000.00
Total Commitments Received: $1,300,000.00
100% SP&R Approval:
Contact Information
Lead Study Contact(s): Tommy Nantung
tnantung@indot.in.gov
Phone: 765-463-1521 ext 248
FHWA Technical Liaison(s): Michael Adams
mike.adams@dot.gov
Phone: 202-493-3025
Commitments by Organizations
Organization Year Commitments Technical Contact Name Funding Contact Name Contact Number Email Address
Illinois Department of Transportation 2004 $25,000.00 James Trepanier Megan Swanson 217-782-3547 Megan.Swanson@illinois.gov
Illinois Department of Transportation 2005 $25,000.00 James Trepanier Megan Swanson 217-782-3547 Megan.Swanson@illinois.gov
Illinois Department of Transportation 2006 $25,000.00 James Trepanier Megan Swanson 217-782-3547 Megan.Swanson@illinois.gov
Illinois Department of Transportation 2007 $25,000.00 James Trepanier Megan Swanson 217-782-3547 Megan.Swanson@illinois.gov
Illinois Department of Transportation 2008 $25,000.00 James Trepanier Megan Swanson 217-782-3547 Megan.Swanson@illinois.gov
Illinois Department of Transportation 2009 $25,000.00 James Trepanier Megan Swanson 217-782-3547 Megan.Swanson@illinois.gov
Illinois Department of Transportation 2010 $15,000.00 James Trepanier Megan Swanson 217-782-3547 Megan.Swanson@illinois.gov
Illinois Department of Transportation 2011 $15,000.00 James Trepanier Megan Swanson 217-782-3547 Megan.Swanson@illinois.gov
Illinois Department of Transportation 2012 $15,000.00 James Trepanier Megan Swanson 217-782-3547 Megan.Swanson@illinois.gov
Illinois Department of Transportation 2013 $15,000.00 James Trepanier Megan Swanson 217-782-3547 Megan.Swanson@illinois.gov
Illinois Department of Transportation 2014 $15,000.00 James Trepanier Megan Swanson 217-782-3547 Megan.Swanson@illinois.gov
Indiana Department of Transportation 2004 $25,000.00 Tommy Nantung Tommy Nantung 765-463-1521 ext 248 tnantung@indot.in.gov
Indiana Department of Transportation 2005 $25,000.00 Tommy Nantung Tommy Nantung 765-463-1521 ext 248 tnantung@indot.in.gov
Indiana Department of Transportation 2006 $25,000.00 Tommy Nantung Tommy Nantung 765-463-1521 ext 248 tnantung@indot.in.gov
Indiana Department of Transportation 2007 $25,000.00 Tommy Nantung Tommy Nantung 765-463-1521 ext 248 tnantung@indot.in.gov
Indiana Department of Transportation 2008 $25,000.00 Tommy Nantung Tommy Nantung 765-463-1521 ext 248 tnantung@indot.in.gov
Indiana Department of Transportation 2009 $25,000.00 Tommy Nantung Tommy Nantung 765-463-1521 ext 248 tnantung@indot.in.gov
Indiana Department of Transportation 2010 $25,000.00 Tommy Nantung Tommy Nantung 765-463-1521 ext 248 tnantung@indot.in.gov
Indiana Department of Transportation 2011 $25,000.00 Tommy Nantung Tommy Nantung 765-463-1521 ext 248 tnantung@indot.in.gov
Indiana Department of Transportation 2012 $25,000.00 Tommy Nantung Tommy Nantung 765-463-1521 ext 248 tnantung@indot.in.gov
Indiana Department of Transportation 2013 $25,000.00 Tommy Nantung Tommy Nantung 765-463-1521 ext 248 tnantung@indot.in.gov
Indiana Department of Transportation 2014 $25,000.00 Tommy Nantung Tommy Nantung 765-463-1521 ext 248 tnantung@indot.in.gov
Iowa Department of Transportation 2004 $25,000.00 Scott Schram -- -- -- Transfer.Research@iowadot.us
Iowa Department of Transportation 2005 $25,000.00 Scott Schram -- -- -- Transfer.Research@iowadot.us
Iowa Department of Transportation 2006 $25,000.00 Scott Schram -- -- -- Transfer.Research@iowadot.us
Iowa Department of Transportation 2007 $25,000.00 Scott Schram -- -- -- Transfer.Research@iowadot.us
Iowa Department of Transportation 2008 $25,000.00 Scott Schram -- -- -- Transfer.Research@iowadot.us
Iowa Department of Transportation 2009 $25,000.00 Scott Schram -- -- -- Transfer.Research@iowadot.us
Iowa Department of Transportation 2010 $25,000.00 Scott Schram -- -- -- Transfer.Research@iowadot.us
Kansas Department of Transportation 2004 $25,000.00 Brian Coree David Behzadpour 785-291-3847 David.Behzadpour@ks.gov
Kansas Department of Transportation 2005 $25,000.00 Brian Coree David Behzadpour 785-291-3847 David.Behzadpour@ks.gov
Kansas Department of Transportation 2006 $25,000.00 Brian Coree David Behzadpour 785-291-3847 David.Behzadpour@ks.gov
Kansas Department of Transportation 2007 $25,000.00 Brian Coree David Behzadpour 785-291-3847 David.Behzadpour@ks.gov
Kansas Department of Transportation 2008 $25,000.00 Brian Coree David Behzadpour 785-291-3847 David.Behzadpour@ks.gov
Kansas Department of Transportation 2009 $25,000.00 Brian Coree David Behzadpour 785-291-3847 David.Behzadpour@ks.gov
Kansas Department of Transportation 2010 $25,000.00 Brian Coree David Behzadpour 785-291-3847 David.Behzadpour@ks.gov
Kansas Department of Transportation 2011 $25,000.00 Brian Coree David Behzadpour 785-291-3847 David.Behzadpour@ks.gov
Kansas Department of Transportation 2014 $25,000.00 Brian Coree David Behzadpour 785-291-3847 David.Behzadpour@ks.gov
Michigan Department of Transportation 2008 $50,000.00 John Barak Andre' Clover 517-749-9001 clovera@michigan.gov
Michigan Department of Transportation 2009 $25,000.00 John Barak Andre' Clover 517-749-9001 clovera@michigan.gov
Michigan Department of Transportation 2010 $25,000.00 John Barak Andre' Clover 517-749-9001 clovera@michigan.gov
Michigan Department of Transportation 2011 $25,000.00 John Barak Andre' Clover 517-749-9001 clovera@michigan.gov
Missouri Department of Transportation 2005 $25,000.00 Dan Oesch Bill Stone 602.712.3135 wstone@azdot.gov
Missouri Department of Transportation 2007 $25,000.00 Dan Oesch Bill Stone 602.712.3135 wstone@azdot.gov
Missouri Department of Transportation 2008 $25,000.00 Dan Oesch Bill Stone 602.712.3135 wstone@azdot.gov
Missouri Department of Transportation 2009 $25,000.00 Dan Oesch Bill Stone 602.712.3135 wstone@azdot.gov
Missouri Department of Transportation 2010 $25,000.00 Dan Oesch Bill Stone 602.712.3135 wstone@azdot.gov
Missouri Department of Transportation 2014 $25,000.00 Dan Oesch Bill Stone 602.712.3135 wstone@azdot.gov
Wisconsin Department of Transportation 2011 $25,000.00 Tom Brokaw Lori Richter 608-264-8435 lori.richter@dot.wi.gov
Wisconsin Department of Transportation 2012 $25,000.00 Tom Brokaw Lori Richter 608-264-8435 lori.richter@dot.wi.gov
Wisconsin Department of Transportation 2013 $25,000.00 Tom Brokaw Lori Richter 608-264-8435 lori.richter@dot.wi.gov
Wisconsin Department of Transportation 2014 $25,000.00 Tom Brokaw Lori Richter 608-264-8435 lori.richter@dot.wi.gov
Wisconsin Department of Transportation 2015 $25,000.00 Tom Brokaw Lori Richter 608-264-8435 lori.richter@dot.wi.gov

Study Description

Objectives

This project is no longer accepting funding, please use Project TPF-5(320) This pooled fund project will provide for continued operation of the North Central Superpave Center to assist agencies and industry with Superpave implementation and hot mix asphalt issues. The NCSC will provide technical assistance, training, communication, and research and development work to meet the needs of the region.

Comments

The North Central Superpave Center Steering Committee meeting was held at the end of January 2003 in which this study was discussed. Funds and state partners are currently being solicited for participation.

Subjects: Pavement Design, Management, and Performance

Title File/Link Type Private
TPF-5(021) Closeout Letter TPF-5(021) Closeout Letter - Signed.pdf Memorandum Public
TPF-5(021) Closeout Funding Spreadsheet TPF-5(021) Closeout Funding Spreadsheet.pdf Other Public
Quarterly Progress Report: October - December 2015 TPF 5(320) Quarterly Report Oct to Dec 2015.pdf Progress Report Public
Quarterly Progress Report: October - December 2014 TPF 5(021) Quarterly Report October to December 2014.pdf Progress Report Public
TPF-5(021) Quarterly Progress Report Jul - Sept 2014 TPF 5(021) Quarterly Report July to September 2014.pdf Progress Report Public
TPF-5(021) Quarterly Progress Report Oct - Dec 2014 TPF 5(021) Quarterly Report October to December 2014.pdf Progress Report Public
Quarterly Progress Report: April - June 2014 TPF 5(021) Quarterly Report April to June 2014.pdf Progress Report Public
Quarterly Progress Report: January - March 2014 TPF 5(021) Quarterly Report January to March 2014.pdf Progress Report Public
Quarterly Progress Report: October - December 2013 TPF 5(021) Quarterly Report Oct - Dec 2013.pdf Progress Report Public
Quarterly Progress Report: July - September 2013 TPF 5(021) Quarterly Report July - September 2013.pdf Progress Report Public
Quarterly Progress Report: March - June 2013 TPF 5(021) Quarterly Report March to June 2013.pdf Progress Report Public
Quarterly Progress Report: January - March 2013 TPF 5(021) Quarterly Report January to March 2013.pdf Progress Report Public
Quarterly Progress Report: October - December 2012 TPF 5(021) Quarterly Report October - December 2012.pdf Progress Report Public
TPF-5(021) Quarterly Progress Report Jun - Sept 2012 TPF 5(021) Quarterly Report June to Sept 2012.pdf Progress Report Public
TPF-5(021) Quarterly Progress Report Mar - Jun 2012 TPF 5(021) Quarterly Report March - June 2012.pdf Progress Report Public
TPF-5(021) Quarterly Progress Report Jan - Mar 2012 TPF 5(021) Quarterly Report January to March 2012.pdf Progress Report Public
Quarterly Progress Report: October - December 2011 TPF 5(021) Quarterly Report October - December 2011.pdf Progress Report Public
July - September 2011 TPF 5(021) Quarterly Report - July to Sept 2011.pdf Progress Report Public
Progress Report: April 1 - June 31, 2011 NCSC Progress Report for April- June 2011.pdf Progress Report Public
Progress Report: Jan1 - March 31, 2011 TPF-5(021)QPR-03-2011.pdf Progress Report Public
Progress Report for Jan 1 - March 31, 2010 NCSC_Progress_Report_January-March2010.pdf Progress Report Public
Progress Report for Oct 1 - Dec 31, 2009 qtrly_rpt_2009-12-31.pdf Progress Report Public
Progress Report for July 1 - Sept 30, 2009 qtrly_rpt_2009-09-30.pdf Progress Report Public
Acceptance Letter TPF5021 Acceptance Letter.pdf Memorandum Public
Progress Report for July 1 - Sept 30, 2006 qrtrly_rpt_qrt3_06.pdf Progress Report Public
Progress Report for Oct 1 - Dec 31, 2006 qrtrly_rpt_qrt4_06.pdf Progress Report Public
Progress Report for Jan 1 - March 31, 2007 qrtrly_rpt_qrt1_07.pdf Progress Report Public
Progress Report for Apr 1 - June 30, 2007 qrtrly_rpt_qrt2_07.pdf Progress Report Public
Progress Report for July 1 - Sept 30, 2007 qrtrly_rpt_qrt3_07.pdf Progress Report Public
Progress Report for Apr 1 -June 30, 2006 qrtrly_rpt_qrt2_06.pdf Progress Report Public
Progress Report for Jan 1 - March 31, 2006 qrtrly_rpt_qrt1_06.pdf Progress Report Public
Progress Report for July 1 - Sept 30, 2005 qrtrly_rpt_qrt3_05.pdf Progress Report Public
Progress Report for Oct 1 - Dec 31, 2005 qrtrly_rpt_qrt4_05.pdf Progress Report Public
Progress Report for Jan 1 - March 31, 2004 qrtrly_rpt_qrt1_04.pdf Progress Report Public
Progress Report for Apr 1 - June 30, 2004 qrtrly_rpt_qrt2_04.pdf Progress Report Public
Progress Report for July 1 - Sept 30, 2004 qrtrly_rpt_qrt3_04.pdf Progress Report Public
Progress Report for Oct 1 - Dec 31, 2004 qrtrly_rpt_qrt4_04.pdf Progress Report Public
Progress Report for Jan 1 - March 31, 2005 qrtrly_rpt_qrt1_05.pdf Progress Report Public
Progress Report for Apr 1 - June 30, 2005 qrtrly_rpt_qrt2_05.pdf Progress Report Public
Statement of Work - State Planning and Research Pooled Fund Program: Operation of the North Central Superpave Center work_plan_06-23-03.pdf TPF Study Documentation Public
Benefits of Participating in the North Central Superpave Center memo_05-30-03.pdf Memorandum Public
Title File/Link Type Private
Base Funding for the North Central Superpave Center work_plan_06-23-03.pdf TPF Study Documentation Public

Currently, Transportation Pooled Fund is not supported on mobile devices, please access this Web portal using a desktop or laptop computer.