skip main site navigation
TPF logoTransportation Pooled Fund Program
TPF logoHomeAbout TPF StudiesAuthorized UsersBrowse TPF Studies, selected sectionSearch TPF StudiesSign Up To Be Notified

skip secondary navigation
TPF Sponsors

Browse TPF Studies>>>By Organization

New Hampshire Department of Transportation
1 - 40 of 57 records
Click the Title to see the Detailed View.

Solicitation posted
NumberTitle
1233Validation and Implementation of Hot-Poured Crack Sealant
Solicitation withdrawn
NumberTitle
924One Coat Paint System for a Lifetime of Corrosion Protection on New Steel Bridges
916Geophysical Testing of Rock and Its Relationships to Physical Properties
822Life Cycle Curves for Sign Management
40Implementation of Lithium Technologies in Mitigation and Prevention of Alkali-Silica Reaction in Concrete
Cleared by FHWA
NumberTitle
TPF-5(222)New England Transportation Consortium (VI)
TPF-5(218)Clear Roads Winter Highway Operations Pooled Fund (continued from TPF-5(092))
TPF-5(201)New England Transportation Consortium (V)
TPF-5(199)Recycled Materials Resource Center
TPF-5(178)Implementation of the Asphalt Mixture Performance Tester (AMPT) for Superpave Validation
TPF-5(151)Subsurface Drainage for Landslide and Slope Stabilization
TPF-5(150)Extending the Season for Concrete Construction and Repair, Phase III
TPF-5(146)Evaluation of Modified Performance Grade Binders in Thin Lift Maintenance Mixes, Surface Mix, and a Reflective Crack Relief Layer Mix
TPF-5(120)Deer Vehicle Crash Information and Research (DVCIR) Center Pooled Fund
TPF-5(117)Development of Performance Properties of Ternary Mixes
TPF-5(068)Long-Term Maintenance of Load and Resistance Factor Design Specifications
TPF-5(065)Traffic Control Device (TCD) Consortium
TPF-5(045)Performance Guidelines for the Selection of Hot-Pour Crack Sealants
SPR-3(073)Micro-Surface Mix Design Procedure
Contract signed
NumberTitle
TPF-5(195)Core Program Services for a Highway RD&T Program - FFY 2009 (TRB FY 2010)
TPF-5(182)SafetyAnalyst Support
TPF-5(174)Construction of Crack-Free Bridge Decks, Phase II
TPF-5(166)Application of Three-Dimensional Laser Scanning for the Identification, Evaluation, and Management of Unstable Highway Slopes
TPF-5(054)Development of Maintenance Decision Support System
TPF-5(051)Construction of Crack-Free Concrete Bridge Decks
SPR-3(089)New England Transportation Consortium
SPR-3(029)New England Transportation Consortium
SPR-2(208)Pavement Subgrade Performance Study
Objectives fulfilled
NumberTitle
TPF-5(168)New England Transportation Consortium (IV)
TPF-5(107)Refinement and Field Validation of Mix Design Criteria for 4.75 mm Superpave Mixes
TPF-5(086)Reducing Crashes at Rural Intersections: Toward a Multi-State Consensus on Rural Intersection Decision Support
TPF-5(075)Extending the Season for Concrete Construction and Repair--Phase II, Defining Engineering Parameters
TPF-5(062)Coordination of Pavement Activities in the Northeast, Phase 2 (Adding new partners & pledges)
TPF-5(059)State-of-the-Art Bridge Surveillance and Security Technologies
TPF-5(028)Product Evaluation--Highway Innovative Technology Evaluation Center
TPF-5(005)Study of Erection Issues and Composite System Behavior of the Full-Scale Curved Girder Bridge Currently Under Construction at the Turner-Fairbank Highway Research Center
TPF-5(003)Extending the Season for Concrete Construction and Repair
SPR-3(080)Reinstatement of Utility Cuts
SPR-3(077)Wiremesh and Cablemesh Slope Protection
SPR-3(076)Animal Vehicle Crash Mitigation Using Advanced Technologies
.................... .................... .................... .................... .................... .................... .................... ....................


Copyright statement and legal notices
Please send comments, suggestions, and queries to the Webmaster.